< Back to easements list

Easement 701747

Implemented by Great Western Railway (GW)

Human-readable text

Passengers travelling to/from London Euston travelling via Winslow may doubleback through Bletchley via Milton Keynes Central on 28 November 2026 and 29 November 2026. This Doubleback easement is applicable in both directions.

Electronic easements

This easement has 2 associated electronic records.

Positive

  • Elec. easement 704620 — Map

    From 2026-11-28 to 2026-11-29 on weekends


    If all of the below apply to the journey:

    • journey diverges from a mapped route, and its divergence is through nodes { Bletchley High Level [BLY] London Euston [EUS] Milton Keynes Central [MKC] Swindon (Wilts) [SWI] Winslow [WNO] }
    • starts at { London Euston [EUS] }
    • ends at { Kemble [KEM] Stonehouse [SHU] Stroud (Glos) [STD] }
    • passes through all of { Swindon (Wilts) [SWI] }

    then the journey may be considered valid, despite not following a mapped route

  • Elec. easement 704621 — Map

    From 2026-11-28 to 2026-11-29 on weekends


    If all of the below apply to the journey:

    • journey diverges from a mapped route, and its divergence is through nodes { Bletchley High Level [BLY] London Euston [EUS] Milton Keynes Central [MKC] Swindon (Wilts) [SWI] Winslow [WNO] }
    • starts at { Kemble [KEM] Stonehouse [SHU] Stroud (Glos) [STD] }
    • ends at { London Euston [EUS] }
    • passes through all of { Swindon (Wilts) [SWI] }

    then the journey may be considered valid, despite not following a mapped route

Negative

  • There are no negative easement records