< Back to easements list

Easement 701679

Implemented by Great Western Railway (GW)

Human-readable text

Between 26 October and 28 October 2026, for journeys on the section of line Hereford to Worcester Foregate Street; to Chippenham, Passengers will be allowed to travel via Bristol Parkway and Swindon. This Map easements is valid in both directions.

Electronic easements

This easement has 2 associated electronic records.

Positive

  • Elec. easement 704392 — Map

    From 2026-10-26 to 2026-10-28 on MTW


    If all of the below apply to the journey:

    • journey diverges from a mapped route, and its divergence is through nodes { Bristol Parkway [BPW] Swindon (Wilts) [SWI] }
    • starts at { Colwall [CWL] Great Malvern [GMV] Hereford [HFD] Ledbury [LED] Malvern Link [MVL] Worcester Foregate Street [WOF] Worcester Shrub Hill [WOS] }
    • ends at { Chippenham [CPM] }

    then the journey may be considered valid, despite not following a mapped route

  • Elec. easement 704393 — Map

    From 2026-10-26 to 2026-10-28 on MTW


    If all of the below apply to the journey:

    • journey diverges from a mapped route, and its divergence is through nodes { Bristol Parkway [BPW] Swindon (Wilts) [SWI] }
    • starts at { Chippenham [CPM] }
    • ends at { Colwall [CWL] Great Malvern [GMV] Hereford [HFD] Ledbury [LED] Malvern Link [MVL] Worcester Foregate Street [WOF] Worcester Shrub Hill [WOS] }

    then the journey may be considered valid, despite not following a mapped route

Negative

  • There are no negative easement records