< Back to easements list
Easement 701679
Implemented by Great Western Railway (GW)
Human-readable text
Between 26 October and 28 October 2026, for journeys on the section of line Hereford to Worcester Foregate Street; to Chippenham, Passengers will be allowed to travel via Bristol Parkway and Swindon. This Map easements is valid in both directions.
Electronic easements
This easement has 2 associated electronic records.
Positive
-
Elec. easement 704392 — Map
From 2026-10-26 to 2026-10-28 on MTW
If all of the below apply to the journey:
- journey diverges from a mapped route, and its divergence is through nodes { Bristol Parkway [BPW] Swindon (Wilts) [SWI] }
- starts at { Colwall [CWL] Great Malvern [GMV] Hereford [HFD] Ledbury [LED] Malvern Link [MVL] Worcester Foregate Street [WOF] Worcester Shrub Hill [WOS] }
- ends at { Chippenham [CPM] }
then the journey may be considered valid, despite not following a mapped route
-
Elec. easement 704393 — Map
From 2026-10-26 to 2026-10-28 on MTW
If all of the below apply to the journey:
- journey diverges from a mapped route, and its divergence is through nodes { Bristol Parkway [BPW] Swindon (Wilts) [SWI] }
- starts at { Chippenham [CPM] }
- ends at { Colwall [CWL] Great Malvern [GMV] Hereford [HFD] Ledbury [LED] Malvern Link [MVL] Worcester Foregate Street [WOF] Worcester Shrub Hill [WOS] }
then the journey may be considered valid, despite not following a mapped route
Negative
-
There are no negative easement records