< Back to easements list

Easement 701393

Implemented by East Midlands Railway (EM)

Human-readable text

Passengers travelling from Market Harborough, Kettering, Corby and Wellingborough to Flitwick, Harlington (Beds), Leagrave, Luton, Luton Airport Parkway and Harpenden may not travel via London St.Pancras. This circuitous route easement applies in both directions. This overcomes the unintended effect of a related positive easement.

Electronic easements

This easement has 2 associated electronic records.

Positive

  • There are no positive easement records

Negative

  • Elec. easement 703697 — Circuitous Route

    From 2025-08-07 on all days


    If all of the below apply to the journey:

    • starts at { Corby [COR] Kettering [KET] Market Harborough [MHR] Wellingborough [WEL] }
    • ends at { Flitwick [FLT] Harlington (Bedfordshire) [HLN] Harpenden [HPD] Leagrave [LEA] Luton Airport Parkway [LTN] Luton [LUT] }
    • does not pass through any of { West Hampstead Thameslink [WHP] }

    then the journey may not pass through any of { London St Pancras International [STP] }

  • Elec. easement 703698 — Circuitous Route

    From 2025-08-07 on all days


    If all of the below apply to the journey:

    • starts at { Flitwick [FLT] Harlington (Bedfordshire) [HLN] Harpenden [HPD] Leagrave [LEA] Luton Airport Parkway [LTN] Luton [LUT] }
    • ends at { Corby [COR] Kettering [KET] Market Harborough [MHR] Wellingborough [WEL] }
    • does not pass through any of { West Hampstead Thameslink [WHP] }

    then the journey may not pass through any of { London St Pancras International [STP] }