< Back to easements list
Easement 701393
Implemented by East Midlands Railway (EM)
Human-readable text
Passengers travelling from Market Harborough, Kettering, Corby and Wellingborough to Flitwick, Harlington (Beds), Leagrave, Luton, Luton Airport Parkway and Harpenden may not travel via London St.Pancras. This circuitous route easement applies in both directions. This overcomes the unintended effect of a related positive easement.
Electronic easements
This easement has 2 associated electronic records.
Positive
-
There are no positive easement records
Negative
-
Elec. easement 703697 — Circuitous Route
From 2025-08-07 on all days
If all of the below apply to the journey:
- starts at { Corby [COR] Kettering [KET] Market Harborough [MHR] Wellingborough [WEL] }
- ends at { Flitwick [FLT] Harlington (Bedfordshire) [HLN] Harpenden [HPD] Leagrave [LEA] Luton Airport Parkway [LTN] Luton [LUT] }
- does not pass through any of { West Hampstead Thameslink [WHP] }
then the journey may not pass through any of { London St Pancras International [STP] }
-
Elec. easement 703698 — Circuitous Route
From 2025-08-07 on all days
If all of the below apply to the journey:
- starts at { Flitwick [FLT] Harlington (Bedfordshire) [HLN] Harpenden [HPD] Leagrave [LEA] Luton Airport Parkway [LTN] Luton [LUT] }
- ends at { Corby [COR] Kettering [KET] Market Harborough [MHR] Wellingborough [WEL] }
- does not pass through any of { West Hampstead Thameslink [WHP] }
then the journey may not pass through any of { London St Pancras International [STP] }